Project, works management and expert report on hydrocarbon decontamination in the Port of Badalona (Barcelona)
- Area decontaminated: 36,000 m2.
- Selective excavation of pyrite waste with compacted clay
- Mixture with magnesite and characterisation of piles
- Earth movement: 1,000,000 m3
- Decontamination budget: €4 million
Proposal for the chemical decontamination of the Flix reservoir (Tarragona)
- Material to be dredged: 260,000 m3
- Retaining walls: 47,000 m2
- 4,625 m conveyor belt
- 929,000 t discharged in landfill
- Budget: €160 million
Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.
- Installation of 5 soil pits
- Sampling for characterisation, in accordance with RD 9/2005, at two levels
- Water sampling: upstream and downstream
- Design of procedure to stabilise soil and clean terrain
Study for the management of contaminated soil in the River Llobregat diversion (Barcelona)
- PEIN sensitive area
- 33,000 m3 contaminated mud
- Drying land and transport to landfill
- Extraction by dredge pump with 50 m3 / h flow
- Length: 3,250 m
- Budget: €2.8 million
Environmental study. Environmental cleaning and recovery of the Bay of Portman. (Murcia)
- The project includes mining operation of 8.5 Mm3 of sediment to be dredged
- Expected duration: 7 years
- On-site treatment of material at a recycling plant.
- Restoration of mine pits.
- Closure of the bay at 300 m from the coastline by retaining walls
Monitoring of noise and vibration levels around the works to extend the FGC railway line in Sabadell.
- Continuous, 24-hour noise measurement in the external environment for several different works and station activities, different receivers.
- Measurement of vibrations in different households along the railway line
Monitoring noise levels continuously, 24 hours a day, in several households near the works on La Sagrera station access chamber, bifurcation chamber and stations. Works on Line 9 of the Barcelona Metro underground system.
- Installation of sound level meters operating continuously, 24 hours a day
- Daily data collection
- Compliance with the resolution passed by the Directorate General for Environmental Quality