Projects
Research, Science and Engineering at the service of greener cities, more efficient companies and more sustainable communities.
Study of the noise impact of the project to widen the IH 35W. North Tarrant. Segment 3. Texas.
- Motorway with 10 lanes, 5 in each direction
- Pass through built-up zones with residential areas
- Simulation by TNM 2.5
- Quality objectives according to TxDOT
- Study of different situations and work phases
Noise impact study of the R2 and R4 railway lines in L’Hospitalet de Llobregat
- Infrastructure formed by three sections, differentiated by number and destination of lines.
- Different configurations of the structure of the lines.
- Type of trains: commuter, regional, medium-distance, goods.
- Noise simulation using CADNA-A
- Visor screens up to 10+7 m
Noise impact study of works on the tunnel and stations on sections 3 and 4 of Line 9 of the Barcelona Metro underground system
- Simulation using CADNA-A
- Application of absorbent noise panels around the perimeters of the chambers
- Covering earth moving conveyor belt; semi-underground discharge unit for tunnelling earth.
- Change in circulation direction of trucks to remove earth.
Environmental sensorisation. Reform of Avinguda Diagonal as regards passages, side lanes and pavements. Francesc Macià-Passeig de Gràcia section. Barcelona
Francesc Macià-Passeig de Gràcia section. Barcelona
- Remote environmental monitoring
- Monitoring of PM10 and noise using low-cost sensors.
- 5 control points along the section of works.
- Environmental audit in real time (hourly and daily data)
- Consulting services for the implementation of improvement works and proposed corrective measures
Monitoring environmental sensorisation of works to build the new Florida market. L’Hospitalet de Llobregat
- Remote environmental monitoring
- Monitoring of PM10 and noise using low-cost sensors.
- 2 control points around the works for the new market.
- Environmental analysis in real time
- Consulting services for the implementation of improvement works and proposed corrective measures
Integral Environmental Control Plan for works at the Port of Barcelona
- Works within the area of the Port of Barcelona with Environmental Impact Statement
- Mixed commission for works monitoring and control
- Control of environmental management by construction companies
- Monitoring environmental vectors: sea water, sea bed, underground water, air quality, etc.
Environmental Control Plan for works at Alba Park. Partial development plan for Cerdanyola del Vallès.
Partial development plan for Cerdanyola del Vallès.
- Total area of Partial Plan: 240 Ha
- Monitoring of surface and underground water quality
- Monitoring of environmental noise quality
- Monitoring of air quality
- Monitoring of quality of natural habitats and biological corridors
- Archaeological monitoring