Projects

Research, Science and Engineering at the service of greener cities, more efficient companies and more sustainable communities.

Corrective measures on environmental impact of work on Ferreries link road (Minorca)

  • 4.2 km trunk and one tunnel
  • 89,000 mhydro seedings
  • Searches for sea turtle
  • Nursery plant production
  • Protection ethnographic heritage
  • 900 macoustic screens
  • Budget: €23 million

Environmental Impact Study Widening of C-25 Eix Transversal trunk road. Section: Les Oluges-Manresa. (Lleida)

  • Widening between PK 87+700 and PK 132+300.
  • Length: 44.6 km
  • Budget for corrective measures: €1.4 million
  • Total budget: €170 million.

Environmental Impact Study FMB project for Line 9. Section 1: Airport-Logistic Park

  • 9 km underground section between Barcelona Airport T1 and Logistic Park in the city of Barcelona.
  • Possible effects on protected aquifers in the Llobregat Delta
  • Budget for corrective measures: €1.2 million
  • Overall budget: €400 million.

Environmental Impact Study of the new tram system between Bellaterra and Montcada i Reixac (Barcelona)

  • 12.3 km urban light railway line communicating the towns of Bellaterra (UAB), Cerdanyola , Ripollet and Montcada i Reixac.
  • Budget for corrective measures: €610,000
  • Total investment: €228 million

Environmental Impact Study South Dike of the Port of Barcelona

  • Total occupation 58.67 ha, of which 0.16 are terrestrial and 58.51 are maritime.
  • Dredging of 2 M of m3
  • Dike construction 8.5 M m3, 90% by sea means.
  • Protection of the habitats of the delta and the coastal wetlands, especially the Camanegre corriol.

Environmental Impact Study of measures to transform the irrigable area of the Segarra-Garrigues canal into irrigated land.

  • Area transformed into irrigated land: 100,000 Ha.
  • Water supply: 342 Hm3/year.
  • Sources: Rialb reservoir, main canal (80 km), Albagés Dam (80 Hm3) and catchment from the River Segre  (69 Hm3/year)
  • Cost of corrective measures: €18.9 million

Environmental monitoring and control of works at the Port of Barcelona

  • Environmental monitoring of works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.

  • Environmental monitoring of the works to concentrate plots, primary network, secondary and distribution network of the Segarra – Garrigues.
  • Control of vectors
  • Design of specific environmental monitoring plans for each work, and monthly monitoring reports.
  • Attendance at mixed commission meetings.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.