Corrective measures on environmental impact of work on Ferreries link road (Minorca)
- 4.2 km trunk and one tunnel
- 89,000 m2 hydro seedings
- Searches for sea turtle
- Nursery plant production
- Protection ethnographic heritage
- 900 m2 acoustic screens
- Budget: €23 million
Environmental Impact Study FMB project for Line 9. Section 1: Airport-Logistic Park
- 9 km underground section between Barcelona Airport T1 and Logistic Park in the city of Barcelona.
- Possible effects on protected aquifers in the Llobregat Delta
- Budget for corrective measures: €1.2 million
- Overall budget: €400 million.
Environmental Impact Study of the new tram system between Bellaterra and Montcada i Reixac (Barcelona)
- 12.3 km urban light railway line communicating the towns of Bellaterra (UAB), Cerdanyola , Ripollet and Montcada i Reixac.
- Budget for corrective measures: €610,000
- Total investment: €228 million
Environmental Impact Study South Dike of the Port of Barcelona
- Total occupation 58.67 ha, of which 0.16 are terrestrial and 58.51 are maritime.
- Dredging of 2 M of m3
- Dike construction 8.5 M m3, 90% by sea means.
- Protection of the habitats of the delta and the coastal wetlands, especially the Camanegre corriol.
Environmental Impact Study of measures to transform the irrigable area of the Segarra-Garrigues canal into irrigated land.
- Area transformed into irrigated land: 100,000 Ha.
- Water supply: 342 Hm3/year.
- Sources: Rialb reservoir, main canal (80 km), Albagés Dam (80 Hm3) and catchment from the River Segre (69 Hm3/year)
- Cost of corrective measures: €18.9 million
Environmental monitoring and control of works at the Port of Barcelona
- Environmental monitoring of works carried out at the Port of Barcelona.
- Air and water quality, waste management
- Characterisation of dredged material in accordance with CEDEX.
Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.
- Environmental monitoring of the works to concentrate plots, primary network, secondary and distribution network of the Segarra – Garrigues.
- Control of vectors
- Design of specific environmental monitoring plans for each work, and monthly monitoring reports.
- Attendance at mixed commission meetings.