Projects

Research, Science and Engineering at the service of greener cities, more efficient companies and more sustainable communities.

Project, works management and expert report on hydrocarbon decontamination in the Port of Badalona (Barcelona)

  • Area decontaminated: 36,000 m2.
  • Selective excavation of pyrite waste with compacted clay
  • Mixture with magnesite and characterisation of piles
  • Earth movement: 1,000,000 m3
  • Decontamination budget: €4 million

Proposal for the chemical decontamination of the Flix reservoir (Tarragona)

  • Material to be dredged: 260,000 m3
  • Retaining walls: 47,000 m2
  • 4,625 m conveyor belt
  • 929,000 t discharged in landfill
  • Budget: €160 million

Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.

  • Installation of 5 soil pits
  • Sampling for characterisation, in accordance with RD 9/2005, at two levels
  • Water sampling: upstream and downstream
  • Design of procedure to stabilise soil and clean terrain

Environmental quality study of soil in the north, northeast and south perimeters of Passeig de Taulat 233 (Barcelona)

  • Site impacted by hydrocarbons in underground water
  • Application of 4 soil pits and 9 piezometers

Study for the management of contaminated soil in the River Llobregat diversion (Barcelona)

  • PEIN sensitive area
  • 33,000 m3 contaminated mud
  • Drying land and transport to landfill
  • Extraction by dredge pump with 50 m3 / h flow
  • Length: 3,250 m
  • Budget: €2.8 million

Environmental study. Environmental cleaning and recovery of the Bay of Portman. (Murcia)

  • The project includes mining operation of 8.5 Mm3 of sediment to be dredged
  • Expected duration: 7 years
  • On-site treatment of material at a recycling plant.
  • Restoration of mine pits.
  • Closure of the bay at 300 m from the coastline by retaining walls

Monitoring of noise and vibration levels around the works to extend the FGC railway line in Sabadell.

  • Continuous, 24-hour noise measurement in the external environment for several different works and station activities, different receivers.
  • Measurement of vibrations in different households along the railway line

Monitoring noise levels continuously, 24 hours a day, in several households near the works on La Sagrera station access chamber, bifurcation chamber and stations. Works on Line 9 of the Barcelona Metro underground system.

  • Installation of sound level meters operating continuously, 24 hours a day
  • Daily data collection
  • Compliance with the resolution passed by the Directorate General for Environmental Quality