Monitoring the environmental quality of groundwater at the old Honeywell factory in Granollers
Plume study of VOC contamination in the mountain stream located to the south.
Environmental technical assistance for works to clean soil and study the quality of groundwater inside the decontaminatedarea around the Can Ninou mountain stream.
Installation of a permeable reactive barrier (PRB).
Programme of environmental actions and EMP of construction work in decanting wetlands. Ebro Delta Water Quality Programme.
Development of Environmental Action Programme to tender the first phase in the Ebro Delta Water Quality Programme. Replenishing bays with freshwater from irrigation canals.