Environmental works management

Management of projects for corrective and preventive measures with regard to environmental impact. Environmentally sustainable construction works. Joint committees for the environmental and social monitoring of works. Green infrastructure.

Environmental monitoring and control of works at the Port of Barcelona

  • Environmental monitoring of works carried out at the Port of Barcelona.
  • Air and water quality, waste management
  • Characterisation of dredged material in accordance with CEDEX.

Environmental management of works to convert the Segarra – Garrigues system into an irrigation system.

  • Environmental monitoring of the works to concentrate plots, primary network, secondary and distribution network of the Segarra – Garrigues.
  • Control of vectors
  • Design of specific environmental monitoring plans for each work, and monthly monitoring reports.
  • Attendance at mixed commission meetings.

Environmental management of works on Line 9 of the Metro de Barcelona underground system

  • 3.9 km section of TMB Line 9, between Zona Universitària and Sagrera – Meridiana stations
  • Attendance of meetings between owners and environmental body (Mixed Commission)
  • Management of 860,000 m3 from tunnelling work.
  • Treatment and management of water from tunnelling work (WWTSs)
  • Control of noise pollution from  access chamber and station shafts.

Environmental management of work on infrastructure at the Port of Badalona (Barcelona)

  • Occupying approximately 1 km of coast and a total area of  28.65 ha.
  • Water surface: 16.55
  • Dyke 700 m in length
  • Fishing dock: 18,500 m2 on land and 20.500 m2 on water, with capacity for 111 mooring places

Environmental management of works to widen the Eix Transversal trunk road. Section: Cervera – Manresa

  • C-25 road , KP 82+000 to 236+000  from Cervera to Manresa
  • Monitoring of environmental impacts and environmental quality of the vectors of the work and surrounding area.
  • Implementation of corrective measures for environmental impact.

Environmental assistance on concessionary works on the C-17 road, Vic – Ripoll section (Barcelona)

  • Environmental consulting and coordination throughout the duration of the works.
  • Project to widen the C-17 road between KP 75+400 and 93+500.
  • Compliance with Environmental Impact Statement and control of environmental vectors.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.