Environmental research and management of works in the area affected by dumping of waste, and procedure for cleaning terrain at the Fira de Bellcaire fair site in Barcelona.
Installation of 5 soil pits
Sampling for characterisation, in accordance with RD 9/2005, at two levels
Water sampling: upstream and downstream
Design of procedure to stabilise soil and clean terrain